Home About Us Products Certificates Distributors News Contact

Quality Control

Measured at every stage, from sand to shipment.

PT Tri Sinar Purnama operates in-process quality control across the full malleable iron production sequence — raw material preparation, casting, annealing, galvanizing, machining and final packing. The checks below are the procedures applied in our Semarang plants, with their measurable acceptance criteria and inspection frequency.

In-process and final inspection procedures

InspectionMethod & acceptance criteriaFrequency
Sand inspectionCompactibility testing of moulding sandEvery 30 minutes
Hit testFracture surface visually observedThree periods per operator, per day
Tensile & elongationMinimum tensile strength 350 N/mm²; minimum elongation 6%Every unloading process
SpectrometerChemical composition, minimum 5 surface test pointsFour times per day
Pressure testSample strength testing — applied in particular to other casting productsEarly casting process
QC sorting100% visual inspectionAfter production
Zinc coating thicknessElcometer, 10 spots per sample, minimum 65 µmDuring process
Dimensional testCalibrated vernier caliper and thickness tester, against the required standardAccording to order instruction
AlignmentMaximum deviation 1.5 mm per 300 mm, or 1 mm per 200 mm3 pcs from each machine, every 30 minutes
Thread testPlug gauge and ring gauge3 pcs from each machine, every 30 minutes
Leakage testMinimum 7 bar, held over 3 seconds100% of products, before packing
AQL inspectionVisual, gauge, alignment and packaging accuracyBefore shipment

Criteria and frequencies above are TSP's own in-process procedures. Applicability varies by product family and by customer order specification — the pressure test in particular applies chiefly to casting products rather than to every threaded fitting.